Washington Square Master Plan and Timeline Reconfigured

According to a Master Development Plan submitted to the City of Bellevue, the previous plan for the Washington Square Expansion, including an office tower and hotel has been canceled and now reconfigured. Instead, a smaller project has been planned with a 2-phase mixed-use project.

The project, which spans about 1.8 acres, includes a 20-story office tower with ground floor active use space above underground parking on the Southern portion of the site. The northern portion of the site proposes to include an 8-story hotel inclusive of 210 rooms with ground floor active use space above underground parking.

Three possible scenarios have been proposed for building the hotel and office tower. These include the hotel and office being built simultaneously, the hotel being built first, followed by the office, or the office being built first and then the hotel. In the application, West77 Partners referred to the plan as the hotel being a part of phase 1 and the office building being a part of phase 2.

The site lies at the northeast corner off the intersection of Northeast 8th Street and 106th Avenue Northeast. Within this Superblock are the two Washington Square Residential Towers, the Hilton Garden Inn Hotel, the Bellevue Office Tower and more. The address is 10620 Northeast 8th Street.

The project originally included phase one designated to the hotel and phase 2 designated to the office tower, set on 1.52 acres. The original plan was slated to begin construction in the winter of 2020/21.

Hot this week

4.22-Acre Mixed-Use Development Approved in Downtown Bellevue

A major mixed-use residential development in downtown Bellevue has...

Bellevue Tip Leads to Conviction in Multi-State Sex Trafficking Case

A federal sex trafficking case that began with a...

Blazing Bagels Closes All Locations, Including Bellevue

Blazing Bagels has closed all of its locations, including...

Adrian’s Restaurant & Tequila Bar in Old Bellevue Closes Abruptly

Adrian’s Restaurant & Tequila Bar has closed abruptly, according...

Salt & Straw Ice Cream Opens in Bellevue April 24 with Giveaways and Events

Salt & Straw will open a new scoop shop...

Daniel’s Broiler Bellevue: 21 Floors Up and Perfect for Any Occasion

Daniel's Broiler has been a Bellevue institution since 1989,...

Bellevue Approves 4-Building Townhome Project with Play Space

A new townhouse development known as Soma Bel-Red Townhomes...

Bellevue Approves Wilburton 442-Unit Apartment Project Near Light Rail

Bellevue has approved design review for Arizona-based Alliance Residential's...

Bellevue Commits More Than $37M to Affordable Housing in Record Funding Round

Bellevue is moving forward with a major expansion of...

Seahawks-Owned Legion Sports Bar in Bellevue Announces Closure

Legion Sports Bar has announced it will be closing...

Amazon Opens New 1.75-Acre Public Park in Downtown Bellevue

A new public gathering space has opened in the...

Japanese Eatery Tendon Kohaku Bellevue Sets the Standard as Seattle Expansion Nears

Twenty-two months after opening, Tendon Kohaku continues to draw...

Related Articles

Popular Categories

Home Comfort Alliance - Banner 728 x 90 for HVAC